If there are two inspectors in an order and they both have the payroll calculation set up for the “Standard Inspection Fee” and the “Radon fee”, the system will calculate the payroll totals for both fees for both inspectors for the same order.
Please solve this issue. Some inspectors may need to only perform a Radon test, a mold test or a sewer scope on an inspection, of if there are 2 inspectors who may need to share the fee at different %’s. Maybe for these circumstances allow application of the inspector fee to be input on the fee tab of the order, which would override the standard payroll setup %’s, this is one way to solve the issue.