Second Inspector Different Time Duration
K
Katie
We would love to have the option to set the allotted time needed for a second inspector assigned to a job instead of it autopopulating to be the same as the primary inspector. Sometimes the secondary inspector is not needed at the job for the whole time as the first inspector. Having this variation option would be helpful and cleaner to visualize on our calendars so that the second inspector's expectations of their day/time needed at each location is laid out cleanly.